Extract of our References

Gas Pipeline Construction
Client:
BEGAS

Country of Execution:
Austria

Branch of Client:
energy provider

Performance Description:
Manufacture of the HD gas pipeline Wulkaprodersdorf

Performance Data:
Material: steel
Dimension: : DN 150 PN 70
Length: 4.5 km

Term of Execution:
2002

Order Value:
Ca. 0,06 Mio €
Client:
BEGAS

Country of Execution:
Austria

Branch of Client:
energy provider

Performance Description:
Manufacture of the MD local supply for Steinberg and
Kaiserdorf

Performance Data:
Material: PE
Dimension: : DN 32 - 160
Length: 12.5 km

Term of Execution:
2002

Order Value:
Ca. 0,06 Mio €
Client:
TIGAS

Country of Execution:
Austria

Branch of Client:
energy provider

Performance Description:
Manufacture of methane extensive natural gas supply in
Tiroler Unterland (Zillertal) incl. construction work

Performance Data:
Material: steel
Dimension: : DN 250
Pressure: PN 16
Length: approx. 25 km

Term of Execution:
2006-2007

Order Value:
Ca. 2,10 Mio €
Client:
TEERAG ASDAG

Country of Execution:
Austria

Branch of Client:
Construction company

Performance Description:
Manufacture of a methane high pressure inverted siphon
in the area of the Ötztaler Ache for TIGAS

Performance Data:
Material: steel
Dimension: : DN 250
Pressure: PN 40

Term of Execution:
2005

Order Value:
Ca. 0,05 Mio €
Client:
EVN

Country of Execution:
Austria

Branch of Client:
energy provider

Performance Description:
Pipe laying work for the construction of gas supply
pipelines, refurbishment work including fault repairs
in the area EVN-east

Performance Data:
Material: PE (Low and medium pressure)
Steel (high pressure)

Term of Execution:
1994 - 2010

Order Value:
annual about. 2,50 Mio €